BY SREEDHANYA HOMES

Kuravankonam, Thiruvananthapuram

K-RERA/PRJ/TVM/054/2022

OVERVIEW

A.I. by SreeDhanya Homes – Kerala’s First Artificially Intelligent Smart Homes That Redefine Modern Living

SreeDhanya Homes proudly introduces Kerala’s first artificially intelligent smart home project in Thiruvananthapuram – A.I. by SreeDhanya Homes. A block of 17 storeys with 2/3 and 4 BHK homes, this future-proof project comes with the revolutionizing technological advantage accorded by artificial intelligence. It simply rewrites the tales of living space comfort and convenience through a bevy of automated functions. Welcome the pack of luxury that gifts you with more time, more freedom and more convenience.With state-of-the-art screen for complete control of your living and dining room, voice controlled home automation system and guest entry access controlled from inside your home, life at A.I. by SreeDhanya Homes smart home takes you way ahead to future.

Location: Kuravankonam, Thiruvananthapuram

RERA REG Number:K-RERA/PRJ/TVM/054/2022

RERA website: rera.kerala.gov.in

Units: 17 storeys of 2,3 & 4 BHK Apartments

Status: Nearing Completion

Automated boom barrier
Automated boom barrier
Access controlled lobby
Access controlled lobby
Lobby with mood lighting
Lobby with mood lighting
Smart lighting in car parking
Smart lighting in car parking
Automated lighting in swimming pool
Automated lighting in swimming pool
Automated lights in gym
Automated lights in gym
Automated gas leak detector
Automated gas leak detector
Access controlled lift
Access controlled lift
Automated garden watering system
Automated garden watering system
Automated hand sanitizer at lobby entrance
Automated hand sanitizer at lobby entrance
Wi-fi enabled basement parking
Wi-fi enabled basement parking
Central control panel
Central control panel
Automated door locks
Automated door locks
Automated smoke detector
Automated smoke detector
Centralized communication hub
Centralized communication hub
Guest entry access at lobby controlled from apartment
Guest entry access at lobby controlled from apartment
Reticulated gas line with usage monitor
Reticulated gas line with usage monitor
Panic button
Panic button
Common area camera access inside apartment
Common area camera access inside apartment
Electric car charging provision in every car park
Electric car charging provision in every car park
USB ports in every room
USB ports in every room
Lift call feature from within apartment
Lift call feature from within apartment
Foundation and structure

RCC Framed structure with Pile foundation

Front Door: Engineered Wood Pre-hung doors of Jac Wood/Jacson/ferro or equivalent make with digital lock(Yale/ Godrej/ Dorset/ Equivalent
Internal Doors: Hard wood Frame & semi solid Flush door shutters / Pre hung door Make (Fero/ Jac/ Jacson/Equivalent with Mortice lock(Yale/ Godrej/ Dorset/ Equivalent)
Balcony door: UPVC door frame& shutter with Saint-Gobain glass.

Godrej/Dorset/Solex /Yale/Equivalent for hinges, tower bolt, magic eye, door catcher etc.

UPVC frame & shutters saint-Gobain Glass, with MS Grill with painted finish

Living/Dining/Bedrooms: Vitrified tiles of size 80cm x 80cm Make: (Johnson/Kajaria/ Nitco/Somany/Asian/ Equivalent
Kitchen: Vitrified tile Flooring of size 60cm x 60cm, Dado Tiles – Ceramic/ Vitrified tiles 60cm height, Quality Black Granite counter top, Stainless steel sink with single drain board Make: (Franke/Reginox/Equivalent), Provision for water purifier.
Work Area: Counter top Granite slab with Single bowl sink, Washing Machine provision
Balcony: Anti-skid tiles Make: (Johnson/Kajaria/Nitco/ Somany/Asian/ Equivalent)
Toilet: Virtified/ceramic wall tile upto the false ceiling height and for flooring Vitrified/ ceramic tile of size 30cm x 30cm Make: (Johnson/Kajaria/Nitco/Somany/Asian/ Equivalent). Provision for Geyser
Common Wash: Counter top wash basin Make: (Vitra/Kohler/ equivalent)

10 Passenger -3no, 13 passenger/ Bed lift- 1 no with Automatic Rescue Device Make: (Johnson/ Kone/ Mitsubishi/ equivalent)

Independent 3 phase wiring Make: (Havells/ V-Guard/Polycab/Finolex/ Equivalent)with ELCB/MCB. Switches of make (Legrand/Havells/Equivalent)

AC provision shall be given in all bedrooms, Dummy points shall be provided in Living area

Automatic Changeover to Generator supply for common Lights and Lifts. Power backup for designated points inside of each flat Make: (Cummins/Kirloskar/ Equivalent).

Reticulated gas supply with individual meters

Concealed connections for telephone in Living and Master bedroom along with provision for broad band connectivity

Concealed connections for telephone in Living and Master bedroom along with provision for broad band connectivity

Round the Clock water supply through sump and overhead tank source from corporation water connection

Premium emulsion paint for inside walls Make: (Asian/ Berger/ Jotun/ Equivalent) Exterior: Premium exterior paint for external walls make (Asian/ Berger/Jotun / equivalent

Project Status Report for AI by Sree Dhanya as of December 31, 2025

STRUCTURAL & CIVIL WORK

  • RCC for Terrace Floor Slab – 100% Completed
  • Column Work Above Terrace Floor – 100% Completed
  • RCC for Swimming Pool – 100% Completed
  • RCC for Overhead Tank (OHT) – 100% Completed
  • RCC for Badminton Court & Gym Floor – 100% Completed
  • RCC for Home Theatre Floor Slab – 100% Completed
  • UG Sump Work – 100% Completed

MASONRY & PLASTERING

  • Block Work – 92/92 Apartments Completed
  • Ceiling Plastering – 92/92 Apartments Completed
  • Internal Wall Plastering – 92/92 Apartments Completed
  • External Wall Plastering – 95% Completed

WATERPROOFING & PLUMBING

  • Inside Apartment Waterproofing – 91/92 Apartments Completed
  • Internal Plumbing Work – 91/92 Apartments Completed
  • Duct Plumbing Work – 21/23 Ducts Completed

TILING & FLOORING

  • Wall & Floor Tiling in Sample Apartments (1F & 2E) – Completed
  • Wall Tiling – 91/92 Apartments Completed
  • Apartment Flooring – 38/92 Apartments Completed

FIXTURES & FITTINGS

  • Balcony Handrail Fixing – 91/92 Apartments Completed
  • Cut-out Handrail Work – 15/15 Locations Completed
  • UPVC Doors & Windows Fixing – 9/92 Apartments Completed

ELECTRICAL WORK

  • Electrical Wall Chasing & Box Fixing – 92/92 Apartments Completed

PAINTWORK

  • Wall Putty – 75/92 Apartments Completed

  • LOCATION

Ready for your next
NEW HOME?

Your search for the perfect space deserves a flawless execution. We handle the intricacies; you enjoy the results.​​

Talk to an Agent

×

Download Brochure